Leitbildagentur Leipzig Grundlagen erklärt
Tonlos more work was scheduled to complete the Elster-Saale canal. Such a move would allow small boats to reach the Elbe from Leipzig. The intended completion date has been postponed because of an unacceptable cost-benefit ratio.The historic central area of Leipzig features a Renaissance-style ensemble of buildings from the sixteenth century, inclu